Curb and shoulder thickness calculator
Work out the subgrade pad for each side of a roadway section. Pick what is at the edge — paved shoulder, unpaved shoulder, curb and gutter, or nothing at all — and the calculator draws the typical section and gives you the pad that brings every zone out flush.
Free · no account · FDOT base and curb tables built in
Calculator
Fill in the mainline and at least one edge, and the section appears here.
What the pad is, and why it is not optional
Every zone across a section finishes flush at the surface, but none of them is built the same way. The mainline carries pavement over base. A paved shoulder carries thinner pavement over a thinner base. A curb carries no pavement at all — just its own height on the flush side.
Those stacks are different depths. The subgrade pad is what makes up the difference, so the bottom of the stabilized subgrade comes out level all the way across and the grading crew has one line to work to.
Worked example
Mainline with 1.5 in. friction, 3.5 in. structural and an 11 in. limerock base is 16 in. of built section. A shoulder gutter on the left contributes 7 in. of curb and nothing else. The pad on that side is 16 − 7 = 9 in. Put a paved shoulder on the right with 3 in. of pavement over a 4 in. base and it also comes to 7 in., so the same 9 in. pad. Both sides finish 28 in. below the surface, exactly like the mainline.
Get it wrong and it shows up late: the base goes in at the wrong elevation, the shoulder does not meet the mainline, and somebody is cutting or filling after the fact. It is arithmetic, but it is arithmetic with four lookups in it, which is why it gets done on a scrap of paper and gets done wrong.
Questions inspectors ask
- What is the subgrade pad?
- The extra thickness of subgrade under a shoulder or curb that compensates for its thinner pavement structure, so the bottom of the stabilized subgrade is level across the whole section. It is the difference between what the mainline is built from and what the edge is built from.
- Where do the base thicknesses come from?
- FDOT's published design tables: optional base group 1 through 15 against the base material. Not every material is published for every group — this calculator greys out the pairings that do not exist instead of returning zero.
- How much does the base step at the edge of travel way?
- Twice, and the calculator gives both for each side. The two surfaces are flush at that joint, so the step at the finished top of base is simply the difference in pavement thickness, and the step at the bottom of base is the difference between the two whole stacks — the same figure as the subgrade pad at that line. One sets the shoulder base against the mainline's, the other cuts the subgrade under it. Further out the shoulder falls at its cross slope and the pad thins, but neither step moves, which is why both are taken at the edge of travel way.
- Why does a curb have two heights?
- The flush side is the height where the curb meets the pavement, and that is what the pad is measured against. The outside face is taller, which is what you see standing above the surface in the drawing. Both come from FDOT Index 520-001.
- What happens when there is no shoulder?
- Nothing is built beyond the mainline, so there is no pad and no stabilized subgrade on that side. The calculator leaves that zone empty rather than inventing a number.
MAC FDOT Helper fills them in for you
You measured the thickness here; the numbers still have to go into MAC. The Firefox extension autofills densities straight into the portal, converts wall station to road station, and checks the ranges before you submit — so every sublot stops being copy and paste.
Also free: water/cement ratio and ACI 305R evaporation rate
This calculator is a tool, not a substitute for the plans, the approved design, or your own professional judgement. Verify every figure against the contract documents and the governing FDOT standards before relying on a result. QCTools is not responsible for decisions made from these outputs.